Tips:
Dear Customer, Please send inquiry to our email: famkitchen@aliyun.com or fullmachinery@hotmail.com or office@fmakitchen.com or info@fmakitchen.com, not leave message via bottom message box, thank you.
Title: Pass-thru upright double door refrigerator
Description:Commercial vertical six door Dual Temperature air cooling refrigerator and freezer.
Keywords:Professional Manufacturer of Commercial Refrigerator, Pass-thru upright double door refrigerator,Front and rear double door pass refrigerator
1.Product Introduction of the Pass-thru upright double door refrigerator
Front and rear double door pass refrigerator,push in from the front door and come out from another side door
2.Product Parameter(Specification) of the Pass-thru upright double door refrigerator
Material: 304/201 stainless steel with stainless steel frame glass door
Voltage(V): 220
Frequency(HZ): 50
Cooling: aircooling
Refrigerant :R404a refrigerant
Temperature range: 2~8℃
Size(MM): 1800*950*2200mm
3. Product Feature And Application of the Pass-thru upright double door refrigerator
☆ Heavy duty stainless steel construction
☆ push in from the front door and come out from another side door
☆ The glass door can be add with demisting function
4. Production details of the Pass-thru upright double door refrigerator
5.Product Qualification of the Pass-thru upright double door refrigerator
6.Deliver,Shipping And Serving of the Pass-thru upright double door refrigerator
7. FAQ
Frequently Asked Questions
1. How to work?
a Quickly response to clients’ inquiry.
b Issue PI to client after reach the agreement.
c Once receiving the down payment, we will arrange the production immediately.
d The machines will be checked rigorously after they are ready.
f After products been tested and packaged, the delivery will be made promptly.
2. Payment?
a. Telegraphic Transfer (T/T): we accept 30% T/T deposit before production and 70% T/T balance before shipment. Full payment in advance for amount less than 5000 USD
b. Western Union (W/U): we accept 100% payment via the Western Union.
3. Inspection?
Test every machine and inspect the machine seriously.
4. Package?
Packing in standard export package
5. How About the Delivery Time?
10~30 days depends on your requirements on the products. We will suggest you the fastest shipping method when you need the products urgently.